Robbinsville Council takes action towards redevelopment of Foxmoore Shopping Center & Town Center South Redevelopment Area Plan

Public Notice:


Township of Robbinsville Legal Notice of Contracts Awarded The Township Council of the Township of Robbinsville has awarded the following contracts at their meeting on October 24, 2013. These contracts and the resolutions authorizing the awards are available for public inspection in the Office of the Municipal Clerk. Awarded as a fair and open contract in accordance with the requirements of N.J.S.A. 19:44A-20.4 et. seq.: Resolution No: 2013-222 Awarded to: ACT Engineers, Inc. 1 Washington Blvd, Suite 3 Robbinsville, NJ 08691 Service: capital engineering services Time Period: October 24, 2013 to October 23, 2014 Cost: not to exceed $20,000 Resolution No: 2013-223 Awarded to: Cofone Consulting Group, LLC 125 Half Mile Road Suite 200, Red Bank, NJ 07701 Service: consulting services to do a redevelopment studies for the Foxmoor Shopping Center Time Period: October 24, 2013 to December 31, 2013  Cost: not to exceed $13,400 Resolution No: 2013-224 Awarded to: Cofone Consulting Group, LLC 125 Half Mile Road Suite 200, Red Bank, NJ 07701 Service: Consultant for the evaluation and recommendations for revisions to the Town Center South Redevelopment Area Redevelopment Plan Time Period: October 24, 2013 to December 31, 2013  Cost: not to exceed $21,400 By: Michele Seigfried Municipal Clerk $30.45 TIMES OF TRENTON 10/28/2013  
This entry was posted in Mercer County NJ, Redevelopment and tagged , . Bookmark the permalink.

Leave a Reply